Skip to content
Home EV charger installed and charging an electric car in Hills District
Level 2 electrical

EV Charger Installation Hills District

Home chargers on their own protected circuit across the Hills, with the network requirements met and any supply upgrade done by our accredited Level 2 team.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

An EV charger installation in the Hills District is often about more than one car. Big double-storey homes in Kellyville, Castle Hill and Bella Vista commonly have two cars in the garage, ducted air throughout and a pool out the back. Add one or two chargers and the supply can be working very hard. We look at the whole house load first, so you get charging that works every night without tripping the main switch.

We’re licensed electricians and an accredited Level 2 team, so we can do the charger, the switchboard work and any network upgrade.

Two-car households

If both cars will be electric, it pays to plan for that now. Two chargers with load management share the available supply automatically, so they never draw more than the house can deliver. We’ll install one charger now and the cabling for the second if you’re not ready to buy both.

Acreage properties

Out at Dural, Kenthurst and Glenhaven, the car may live in a shed or detached garage well away from the house. Those runs need a properly sized cable and often a sub-board in the shed. We trench the cable, protect it and size everything so the charger still delivers full speed at the end of a long run.

Supply and network

Most of the Hills is supplied by Endeavour Energy, though some areas, Cherrybrook among them, are on Ausgrid. NSW rules allow a single phase charger up to 32 A, about 7 kW. Higher-current chargers need to support demand response and be notified to the network. If your home needs a bigger connection, the application goes in first, and we lodge it.

Big Hills homes with ducted air, pools and induction cooking are often better served by a three phase power upgrade, which also opens up 11 kW charging. Where the supply is single phase and the mains are original, a consumer mains upgrade may be needed before the charger goes in.

Switchboard capacity

Even newer homes can have a full switchboard after years of additions. If there’s no room for a new protected circuit, or the board is an older fuse type in an established street in Baulkham Hills or Winston Hills, a switchboard upgrade is part of the job.

Solar and batteries

Many Hills homes have large solar systems, and some have batteries. A solar-aware charger puts surplus generation into the car rather than exporting it. We’ll set it up to suit your system and how the cars are used during the week.

Granny flats and dual households

Many Hills properties now have a granny flat, often with its own car. If the granny flat is fed from the main house, a second charger adds to the same supply. We look at both dwellings together, check the main switch and mains can carry everything, and set up load management if two chargers will share the supply. If the granny flat has its own meter, we treat it as a separate install. Either way, we’ll tell you the simplest arrangement that works for both households.

Book a quote

Talk to your local level 2 electrician Hills District team for a fixed price. We install chargers from level 2 electrician Rouse Hill and Beaumont Hills to Castle Hill, West Pennant Hills and Dural.

Updated

Prices depend on the charger or chargers, the cable run, the switchboard and whether the supply needs upgrading. Two-car and acreage jobs vary more. We quote a fixed price after a site visit.

What good ev charger installation looks like

Close-up of ev charger installation on a home in the Hills District area
What ev charger installation looks like up close on a typical Hills District area home.
Signs that ev charger installation needs attention
Typical signs that it needs attention.

EV Charger Installation in the Hills District: step by step

  1. AssessWe look at your board, supply and load, and how many cars you want to charge.
  2. QuoteA fixed written price, including load management or supply upgrades if they're needed.
  3. InstallWe fit the charger on a dedicated circuit with RCD protection and lodge the network notification or application.
  4. CommissionWe test, set up schedules and load sharing, and give you the compliance certificate.

EV Charger Installation questions in the Hills District

Something else on your mind? Call 02 9158 9966 and ask.

Can I charge two EVs at home?

Yes. With two chargers, load management lets them share the available supply so they don't overload the house. On three phase you can usually run both at a good speed.

Which network supplies my home?

Most of the Hills is on Endeavour Energy, while some areas such as Cherrybrook are on Ausgrid. We check which applies and follow that network's rules.

My house already has ducted air and a pool. Will a charger fit?

Possibly, but those are big loads. We'll measure what the house uses and tell you whether a charger fits as is, needs load management, or calls for three phase.

Can you install a charger I've already bought?

Yes, as long as it meets the NSW rules, including demand response for higher-current units. We check before installing.

How long does an install take?

A simple garage install takes a few hours. Acreage runs or supply upgrades take longer, and we'll tell you upfront.

Can the charger tell me how much it costs to charge?

Most smart chargers track energy use in an app, so you can see your costs.

Need a Level 2 electrician in the Hills?

📞 Call now Free quote